Hoàng Quốc Phú
- Trang chủ
- /
- Hoàng Quốc Phú
Đánh giá từ VMC Works
Hành trình nghề nghiệp
Kinh nghiệm
TUV SUD PSB Vietnam (Germany) - staff
01/01/2010 - 01/01/2011
Inspector
Diesel Distribution System
● Transformer , ATS, HV, LV panel, DC charger, UPS,
● CCTV, Security System & Card Reader System
● Building lighting, street lighting, parking area lighting
● Fire alarm system
● Implementation of the explosion protection concept for the sterilization equipment.
● Issuance of a final report
COMIN ASIA(France) - staff
01/01/2011 - 01/01/2013
MEP Design team Leader for MEPF
● Coordinate with structure, Architecture, Infrastructure and Owner
● Lead MEP team include MVAC, Firefighting, Plumping, HV, STP, ,...and Main contractor
Design Electrical system: HV, LV, ELV systems,
LE MERIDIEN SAIGON HOTEL( 5 stars)
Position: Electrical and Automation Engineer
Installation, Testing and commissioning relate system:
● LV System : Lighting for guest room, restaurant, bar and main lobby, kitchen - power
socket - trunking, cable ladder – Electric system for pumping and chiller, fan, hot water, kitchen,
restaurant.
● Transformer, MSB, Generator, LV, AC panel, DC, UPS
● Security system: install, testing commissioning
● Data and telephone: installation and testing.
● BMS, fire alarm,...
● Implementation to install , testing and commissioning
NUI PHAO MINING PROJECT
Position: Site manager
● Install HV panels, LV Panels and control panels, Transformer, ...
● Install instrument, DDC, SCADA,...
● Pull power cable and control cable include head line , cable rack and grounding
● ELV system: data and fire alarm
● Testing and commissioning
DO THANH INTERNATIONAL HOSPITAL
Position: testing and commissioning
● Transformer installation, MSB installation, isolator transformer.
● Lighting system, Power system, trunking and cable ladder system
DAELIM (Korea) - staff
01/03/2013 - 01/10/2015
E&I QA/QC
The supervisor related FGD, ESP, Gas station, boiler, power house, water treatment, ...
● Prepare Documents and submission to consultant and client
● Prepare method statement for electrical construction
● Prepare procedure for shop test and site test
● Testing and commissioning related to the boiler, FGD, gas station, ESP, steam, power
house, excitation transformer, main transformer, utilities transformer, water treatment, control room,
relay, ...
● Testing and commissioning 110kV switchyard, including grounding, SCADA, relay,
instrument, ...
● Support COD
Supervise related system: Lighting, Fire alarm, valve, generator, inverter, transformer, switchyard,
instrument, cable, tray, MCC, PLC ,motor, SCADA, DC charger, UPS.
VEOLIA Water Solution (France) - staff
01/01/2015 - 01/11/2020
Lead EICA (Team leader)
2. Hau Giang water treatment
● Responsibilities for Design Electrical System, Automation system, pump, valve,...
● Control cost and budget for the project
● Coordinate with the procurement team, Forwarder company to support the technical and
logistics, import tax, ...
● Prepare and review equipment technical specification: Panels, Switchgears, transformer
stations, PLC, SCADA, DC, Charger and UPS,pump, valve, pipe,...
● Coordinate with employer and Engineer for review design and technical document
● Implementation at site; installation, testing and commissioning
● Coordinate with civil team, mechanical team
● Quality Control and Handover to customer
TRACTEBEL ENGIE - staff
01/11/2020 - 01/06/2022
Owner’s Engineer (deputy site manager, Electrical manager)
Thanh Phong wind power plant (30MW), Hậu Giang solar power plant (50MW)
● Responsibilities inspection installation, testing, commissioning relates to
Electrical system and automation system Substation, transmission line, and extension
feeder: 110kV switchyard ,22kV Switchgear, generator, ATS, SCADA, instrument, DC, UPS,
Charger, inverter,...
● Review and approve concept, technical and detail design: electrical, control for
22kV, 110kV substation, transmission line, and electrical part at farm.
● Supervise civil work related to turbine foundation, road, crane pad, and
equipment foundation
● Simulate the trailer on the road for blade, crane and tower section
● Check anchor cage installation
● Checking the incoming material and equipment
● Control and monitoring turbine installation include: tower section, nacelle,
generator, hub, blade, electrical equipment,...
● Join to inspection, walk down, pre-com and commissioning all the plant
● Review and coordinate with SCADA system and support for COD
● Supervise and support logistics
CPCEC - staff
01/05/2022 - 01/01/2025
Electrical manager and maintenance manager
Coordinate perform maintenance, performance and warranty work for turbine
and plant operation
● Coordinate and schedule outages
● Administer contracts and manage certain on-site contractor activities
● wind farm generation, turbine performance, and maintenance issues to
management
● Manage operation substation, transmission line, outgoing bay
● Make clear defect, correction error, ...
Bằng cấp
bachelor
Bachelor of Engineering (Electric)
2007
master
Master of Business Administration
2016
Người tham chiếu
Viết bình luận
Đăng nhập để bình luận